Toltec Power Station Permit Application
WREG assisted Toltec Power Station, LLC with permitting for a planned 2,000 megawatt natural gas-fired combustion turbine project near Eloy, Arizona. WREG prepared a combined construction/operating permit application for submission to Pinal County. ...

Tagged as: Air Quality Related Values (AQRVs)/Visibility, Construction Permits, Control Technology Evaluation (BACT/LAER), Dispersion Modeling/Permitting, Independent Power Producers, Operating Permits, Prevention of Significant Deterioration (PSD) Permits
Solution Mining and Mineral Processing Permit Revisions
WREG assisted a solution mining and mineral processing client in revising their Prevention of Significant Deterioration (PSD) permits to incorporate a number of substantive technology and emission changes that ...

Tagged as: Air Quality Related Values (AQRVs)/Visibility, Construction Permits, Dispersion Modeling/Permitting, Manufacturing & Mining, Prevention of Significant Deterioration (PSD) Permits
Platte River Power Authority Combustion Turbine Projects
WREG has prepared Prevention of Significant Deterioration (PSD) permit applications for five simple-cycle, natural gas-fired combustion turbines at Platte River Power Authority’s Rawhide Energy Station in northern Larimer County, ...

Tagged as: Air Quality Related Values (AQRVs)/Visibility, Construction Permits, Control Technology Evaluation (BACT/LAER), Dispersion Modeling/Permitting, Power Plants/Utilities, Prevention of Significant Deterioration (PSD) Permits
Panda Gila River Project Permit
WREG prepared the Prevention of Significant Deterioration (PSD) and operating permit application for the Panda Gila River Project in Maricopa County, Arizona. The project was developed by Panda Gila River, LP. The ...

Tagged as: Air Quality Related Values (AQRVs)/Visibility, Construction Permits, Control Technology Evaluation (BACT/LAER), Dispersion Modeling/Permitting, Independent Power Producers, Monitoring Plans (CAM/CEMs/QA), Operating Permits, Prevention of Significant Deterioration (PSD) Permits
Malt Beverages
WREG’s Principals have provided air quality assistance to a major malt beverage manufacturer since the early 1990s. With facilities around the country, including major facilities in Colorado, projects have included: Construction permit for a modification of brewlines and associated equipment. ...

Tagged as: Compliance Assistance, Construction Permits, Control Technology Determination (RACT), Emission Inventory/Calculations, Food & Beverage, New Source Performance Standards (NSPS), On-site Support, Prevention of Significant Deterioration (PSD) Permits, Regulatory Evaluation, Training
Bowie Power Station Permit Application
Bowie Power Station, LLC, retained WREG to prepare a combined construction/operating air permit application for a 1,000-megawatt natural gas-fired combustion turbine project to be located in southeast Arizona. The permit application included a description ...

Tagged as: Air Quality Related Values (AQRVs)/Visibility, Construction Permits, Control Technology Evaluation (BACT/LAER), Dispersion Modeling/Permitting, Emission Inventory/Calculations, Independent Power Producers, Operating Permits, Prevention of Significant Deterioration (PSD) Permits
