Control Technology Evaluation (BACT/LAER)

Toltec Power Station Permit Application

WREG assisted Toltec Power Station, LLC with permitting for a planned 2,000 megawatt natural gas-fired combustion turbine project near Eloy, Arizona. WREG prepared a combined construction/operating permit application for submission to Pinal County. ...


Tagged as: , , , , , ,

Platte River Power Authority Voluntary Emissions Reduction Agreement

The Colorado regulations allow a source to enter into Voluntary Emissions Reduction Agreements (VERAs) with the Colorado Air Pollution Control Division (APCD). A VERA provides the source ...


Tagged as: , ,

Platte River Power Authority Combustion Turbine Projects

WREG has prepared Prevention of Significant Deterioration (PSD) permit applications for five simple-cycle, natural gas-fired combustion turbines at Platte River Power Authority’s Rawhide Energy Station in northern Larimer County, ...


Tagged as: , , , , ,

Panda Gila River Project Permit

WREG prepared the Prevention of Significant Deterioration (PSD) and operating permit application for the Panda Gila River Project in Maricopa County, Arizona. The project was developed by Panda Gila River, LP. The ...


Tagged as: , , , , , , ,

Bowie Power Station Permit Application

Bowie Power Station, LLC, retained WREG to prepare a combined construction/operating air permit application for a 1,000-megawatt natural gas-fired combustion turbine project to be located in southeast Arizona. The permit application included a description ...


Tagged as: , , , , , , ,

Beverage Container Manufacturing Upgrades

WREG assisted a metal beverage container facility with upgrades at its Colorado facility. The project involved the replacement and upgrade of equipment, and changes in the inks, coatings, and cleaners used. The project required two ...


Tagged as: ,

Contact Us

Need to contact Us? You can Email Us.